About Project
Structural Condition Assessment including concrete coring and testing to analyse root causes analysis of water seepage in several location around Rail Receivable area in Townsville port was carried out in July 2015.
As part of structural condition assessment, Aria Engineering team processed the collection of data including site observations and systematically used them to evaluate and assess the condition of the existing structure.
As part of our assessment we arranged for drill test and sampling in excess of 1.6m behind retaining wall.
Comprehensive risk assessment was carried out with relevant stakeholders to ensure all safety and operation risks were fully considered and addressed before proceeding with assessment.
Concrete coring and Laboratory testings including compressive Strength Test, Carbonation and Chloride Content Analysis was undertaken as part of this investigation.
Our Latest Project

Eight Mile Plains Townhouse Development

Luxury New Home Emmadale Garden QLD
